Building terms
Short definitions of the words that come up in approvals, engineering drawings and builders' quotes.
- Beam
- A horizontal structural member that carries load across an opening to supports at each end.
- Complying development certificate (CDC)
- The approval issued under the complying development pathway, combining planning and construction approval.
- Conditions of consent
- The requirements attached to a development consent that must be met at set stages of a project.
- Construction certificate
- Confirms that detailed construction plans are consistent with the development consent and the building code.
- Development application (DA)
- An application to council for consent to carry out development that is not exempt or complying.
- Dilapidation report
- A dated record of the condition of neighbouring buildings and public land before building work begins.
- Easement
- A right over part of a property, commonly for drainage or a service pipe.
- Exempt development
- Minor work that needs no planning approval if it meets all the standards in the State Policy.
- Footing
- The part of a structure that transfers its load to the ground.
- Home building compensation cover
- Insurance a NSW builder must hold for residential jobs over $20,000, protecting the owner if the builder cannot finish or fix the work.
- Load-bearing wall
- A wall that supports weight from the structure above it, such as roof framing or an upper floor.
- National Construction Code (NCC)
- The national set of technical requirements for the design and construction of buildings.
- Occupation certificate
- Issued at the end of a project to confirm the building is suitable to occupy.
- Principal certifier
- The council or registered certifier responsible for inspecting the work and issuing the occupation certificate.
- Reactive clay
- Clay soil that swells when wet and shrinks when dry, moving the footings built on it.
- Underpinning
- Strengthening or deepening an existing footing.